news-aug-17-topimg1.jpg
news-aug-17-topimg.jpg
bullet-img.jpg
How to maximize natural lighting in your Pre-Engineered Steel Building

Daylighting can make a major contribution to energy efficiency and comfort, Skylights increases light quality and reduces energy load .They are an excellent source of natural light: they can transmit more than three times as much light as a vertical window of the same size, distributing it evenly, saving energy and improving your visual comfort levels.

Skylights can also increase the amenity of internal spaces that might otherwise require supplementary artificial lighting. They allow additional flexibility in architectural design. Even under overcast conditions the use of skylights can ensure spaces are predominantly lit by natural light, with little or no supplementary artificial lighting required.

Key factors to consider while designing skylights

news-aug-17-img1.jpg

The daylighting system is designed to bring natural sunlight into the building in such a manner that electric lights can be turned off during the day. The recommended level of illumination in a building shall be based on functional requirement. For example inspection areas in a building need higher level of illumination than storage area. Other key elements that impact the design of skylight include roof height, daylight penetration, occupant’s visual comfort, thermal comfort and energy efficiency.

While installing skylights, you must study the sun trajectory in combination with the layout of the building. Sun trajectory takes into account the location of the site, orientation of the building, roofing material used and layout of the space.

Design Recommendations - During the design process, the following design strategies should be understood and explored:

bullet.png Increase perimeter daylight zones-extend the perimeter footprint to maximize the usable day lighting area. news-aug-17-img2.jpg
bullet.png Allow daylight penetration high in a space. Windows located high in a wall or in roof will result in deeper light penetration and reduce the likelihood of excessive brightness.
bullet.png Allow daylight penetration high in a space. Windows located high in a wall or in roof will result in deeper light penetration and reduce the likelihood of excessive brightness.
Usually skylights cover 3%-10% of the total roof area, in an industrial building in India.
bullet-img.jpg
Leak Proof Roof System for Pre-Engineered Steel Buildings: TRACDEK® SS-2000®, Roofing Profile

news-aug-17-img3.jpgTRACDEK® SS-2000® , also known as TRACDEK® Vertical Leg Structural Standing Seam Roof System, blends the aesthetics of an architectural panel with the strength of a structural panel. These panels have good uplift ratings assuring the reliability of the roof and can go down to roof slopes of up to 1:50. The designer is thus afforded a flexible tool to meet any design challenge.

Architectural Structural Panel
TRACDEK® SS-2000® is a field seamed system that combines a slim rib with exceptional uplift resistance. This panel has been designed to withstand the most rigorous conditions. This systems features optional factory installed hot-melt mastic for low slope applications to ensure weather tight seams. Ribs are provided for added aesthetic value.

Uplift Ratings news-aug-17-img4.jpg

The TRACDEK® SS-2000® system has been tested for uplift ratings to satisfy most building requirements.

On-site Roll Forming
Facility of on-site roll forming eliminates panel end lap condition. Panels are manufactured ‘at-the-eaves’ enabling single length panels on long roof runs.

bullet-img.jpg
Project Spotlight: Steel Strips Wheels Ltd.

Interarch India’s leading Pre-Engineered Metal Buildings & Steel Construction Company has recently completed project for Steel Strips Wheels Ltd in Gujarat. The scope of work included design & engineering, fabrication, supply and erection of five Pre-Engineered building spread over an area of 28,000 Sq. M

news-aug-17-img8.jpg
Project Name Steel Strips Wheels Ltd.
Project Location Mehsana, Gujarat
Building Usage Manufacturing
Project Area 28,100 Sq. M.
No of Building 5
Length 140 M
Width 68 M
Height 15 M
Collateral Load 40 Kg/m2 on Purlins & rafters
Live Load 0.15 KN/m2
Seismic Zone IV
Roof Slope 1:20
Cranes 2 MT EOT crane is considered for 7.146 M span, 12 M run
Roofing Profile 0.55mm Tracdek Roof Profile
Wall Cladding Profile 0.50mm Tracdek Hi Rib Wall Profile
news-aug-17-img10.jpg
bullet-img.jpg
Industrial Spokesperson: Er. (Dr) Abhay Gupta

news-aug-17-img5.jpgSkeleton Consultants Pvt Ltd, one of the leading Integrated Project & Engineering consultancy firm started its operation in 1989. Er. Abhay Gupta is one of the directors in SCPL and is a well-known structural engineer with over 35 years of professional experience, and member of CED 46, P5 & P9 committee in National Building code 2016. He has expertise in multistory buildings, Heavy EOT Crane loading building and optimized design of Industrial structures.

According to him, Buildings in European countries PEB have more standard designs, which help in saving time during engineering stage and increase the quality of the building. For fabrication drawing barcode method is used for part marking of components while in India manual marking is done. Barcode method help in minimizing the erection issue at the site as one can easily identify where the member has to be fixed.

He further suggest that role of Structural engineers will change in near future as they will play a role of single point coordinator for work between Client and Architect for project optimization. Nowadays, Engineers needs to give more focus and understand the metallurgy of steel structure, as sometimes high strength bolts are not used which effects the overall quality of the building.

He feels that there is a large scope for steel buildings in time to come; we are seeing steel structures for new applications like high rise residential buildings, low rise commercial buildings, hospitals and buildings in the educational sector as fast construction is required in these sectors. His favourite projects is a G+13 residential building in J&K, made in steel with an area of over 7,00,000 Sq ft and G+3 Hospital building made in NCR in just 9 months.

While discussing Green Buildings, he feels Steel buildings are gaining major importance in India, considering the tremendous benefits that it offers. PEB structures can be recycled after the building is dismantled. The energy efficient methods used in producing the steel for Pre-engineered structures and the high recycled content help in substantially reducing greenhouse gas emission. It is indeed an environment-friendly and energy efficient construction technology.

As per him client should focus on building maintenance, he suggests steel buildings must be checked for tightness of the bolts/bracing and connects after initial use of 6 months. Also, building should have proper rain water disposal system and polycarbonates sheets should have proper support otherwise there is a possibility of damage.

bullet-img.jpg
Customer Testimony

news-aug-17-img6a.jpgInterarch Building Products delivered a Pre-Engineered Steel Building project of JDB Steel at Chhatabari in Guwahati. We are satisfied with the work & happy with the timely completion of the project. We wish Interarch very best in all their future endeavors.

news-aug-17-img7.jpg
Project Won Project Completed
bullet.png Kia Motors Corporation in Andhra Pradesh
bullet.png L & T Ltd in Gujarat
bullet.png Glenmark Pharmaceuticals Ltd in Tamil Nadu
bullet.png Liugong India Pvt Ltd in Madhya Pradesh
bullet.png Endurance Technologies Pvt Ltd in Maharashtra
news-aug-17-img11.jpg
bullet.png Sensarom Foods Pvt Ltd in Karnataka
bullet.png PPG Asian Paint Ltd in Tamil Nadu
bullet.png Nahar Logistics Park Pvt Ltd in Punjab
bullet.png Pinkcity Jewel house Pvt Ltd in Rajasthan
bullet.png Megaa Moda Pvt Ltd in West Bengal
news-aug-17-img12a.jpg
bullet-img.jpg
Press Coverage

Interarch received press coverage in B2B Purchase Magazine in July 2017.

news-aug-17-img13.jpg
bullet-img.jpg
Interarch Building Products organized Blood Donation Camp

Blood Donation camp was organized with Rotary Noida Blood Bank on Monday, 14th Aug 2017 at Noida Office

news-aug-17-img14.jpg
bullet-img.jpg
Trivia Question of the Month

How long is the longest building delivered by Interarch in India?

a) 750 M
b) 580 M
c) 900 M
d) 800 M
bullet-img.jpg
Tech Zone-Policies on corporate use of Email & their ethics
news-aug-17-img15.jpg
bullet.png Address your contact with the level of seniority and make sure you spelled their name correctly.
bullet.png Check the spellings, punctuations and grammar in the email as it must not contain any grammatical or syntax error
bullet.png The formatting of the email should be done in proper way
bullet.png All relevant information should be covered in the mail
bullet.png Write complete sentences and no short forms should be used to avoid miscommunication and confusion
bullet.png Read your email carefully before sending it
bullet.png Check carefully the mail you are marking TO, CC & BCC
bullet-img.jpg
Building made possible in Steel: Swiss Re London

news-aug-17-img16.jpgAt the heart of the City, at 30 St. Mary Axe, the headquarters of the Swiss Reinsurance Company is not only an unmistakable landmark on the London skyline, but also the first skyscraper built with British capital ecological criteria.

The variation of the diameter of the plants is significant, measures 49 meters at the base, 56.5 at the widest part, tapering to 26.5 on the top floor, which is what gives it the appearance of “rocket” or “cucumber” as Londoners have been baptized.

The structure is composed of a central core surrounded by a grid of interconnected steel elements diagonally. The supporting tower system is ensured by this outer steel armor whose cornerstone is formed by two powerful inverted V, with up to two levels. There are 18 pieces that make up each ring structure, complete, it has 19 overlapping rings. The total weight of steel used is approximately 11,000 tones.

SUSTAINABLE BUILDING:

bullet.png The tower is aerodynamically designed to reduce wind load on the structure, whilst the lower part tapers so that wind wraps around the tower.
bullet.png The six fingers of accommodation on each floor, configured with light wells in between, maximize daylight penetration.
bullet.png The façade design with advance glazing technologies, ventilated cavities and blinds, provides up to 85% solar protection.
news-aug-17-img17.jpg
news-apr-15-img20.jpg






This email was sent to *|EMAIL|*
why did I get this?    unsubscribe from this list    update subscription preferences
*|LIST:ADDRESSLINE|*