The Indian Pre-Engineered Steel Buildings market is experiencing robust growth fuelled by infrastructure development and the increasing popularity of PEB systems in the industrial sector.

It has been an interesting journey for the PEB industry over the last almost three decades in terms of observing the changing trends in the Indian construction industry. With the complete three sixty degree view of a building structure right from the engineering to manufacturing at our plants and final assembling at site, we have experienced great results within the infrastructure space and we wish to be able to fulfill the upcoming demands in the market.

Thanks & Regards,
Arvind Nanda & Gautam Suri
Founder Directors - Interarch Building Products
 
 
New Possibility in Aviation Industry
   
Since the inception in 1984, Interarch has been instrumental in the aviation sector. Interarch was the first company to introduce window coverings through their product TRAC and first one to introduce engineered metal roofing and cladding systems. Interarch entered into Infrastructure projects as it bagged the largest order for turnkey supply of one-of-its-kind composite roofing system and pre-engineered
roof structural system for the Indira Gandhi International Airport Terminal-3, New Delhi which was completed in 2010.
Possibilities in Pre-Engineered Steel for the Aviation Sector
Terminal Buildings
Piers structure and roofing
Air plane Hangars
Cargo and freight stations
Flight Kitchens annexure buildings
Warehouses
Fire Stations buildings
Roof & Ceiling of buildings
Advantages of using Interarch Pre-engineered buildings for Aviation sector
Smaller manageable parts no matter how large the final structure - Helps logistics and reduces transport costs
Bolt-On assembly - All sections are designed to align perfectly during assembly
Ready to build - Shaped, welded and tested for designed load conditions
Manufactured to endure - Specialized coatings and treatment available for longevity
Shipped smart - Smart logistics and shipment synchronized with construction requirements at project site
 
 
 
Interarch Contribution to Green Buildings - Operations & Maintenance Optimization
   
No matter how sustainable a building may have been in its design and construction, it can only remain so if it is operated responsibly and maintained properly. Ensuring operations and maintenance (O&M) personnel are part of the project's planning and development process which will help in retaining the green criteria designed at the onset of the project. Every aspect of green building is integrated into the O&M phase of a building's life.

The addition of newergreen technologies also falls under the O&M staff, although the goal of waste reduction may be applied during the design, construction and demolition phases of a building's life-cycle, it is in the O&M phase that green practices such as recycling and air quality enhancement take place.

Some of the practices followed by Interarchan IGBC member for providing and maintaining Green Buildings.

Our buildings are 100% steel which is recyclable up to 90%, this saves primary resources and reduces waste hence saves energy
Ventilation system - Unique designs of our buildings help in proper air flow and temperature control thus providing healthy & comfortable indoor environment
We use bare Galvalume with steep slope(>1:6)- this minimizes the heat island effect
We install 3-5 % skylights on the roof of the total roof area of the building which reduces the need of artificial lights inside the building and saves electricity
Our buildings help in reducing the carbon footprint by reducing the solid waste, improving air and waste quality and conserving natural resources by reducing the rate of consumption
We employ energy efficient methods in steel production that help to substantially reduce greenhouse gas emissions in our state of the art manufacturing facilities.
Pollution free and further recyclable- Even after demolition, our buildings don’t accumulate wastage like asphalt shingles, concrete, brick and dust in the environment and steel can be recycled for other applications too
 
Sector Snapshot - Aviation Sector Outlook in India
   
India's aviation industry has been witnessing a boom due to exponential growth in the domestic passenger carriage, cargo movement and international air traffic. According to Ministry of Civil Aviation, the Passenger terminal capacity in all airports put together is expected to be 230-240 million by 2012 and by 2017 it would be
about 370 million across all airports as per the investment plans of the operators. Cargo growth presently being witnessed will necessitate investment in specialized cargo terminal and equipment’s.With the opening up of the airport sector for private participation, five airports are under the PPP model and these are Hyderabad, Bangalore Delhi, Mumbai, and Cochin.

For airports, the prime concerns, functionally and aesthetically, are usually the large clears span framing can be easily made in steel. Steel is also faster in construction in comparison to other materials and less disturbance at site, which further results in faster construction resulting in early occupancy & early return on investment. For large storage of cargos, vertical multistory steel buildings and retrieval system, steel helps in faster storage and delivery. Steel can offer highest architectural flexibility in design and fabrication.

The product has been successfully applied for various steel structures under this sector, like Airport terminal buildings, Air plane hangars, Cargo and freight stations, warehouses, fire station buildings and roof and ceiling of buildings.

 
JIT followed in Logistics & Tracking of Order by Interarch
   
Interarch follows a delivery system very similar to a typical JIT (Just in Time) form of logistics management. Interarch transports all their material to site via trailers and trucks to accommodate the entire building at site within a few days. During construction of a pre-engineered building, the material supply has to be planned carefully keeping in mind the erection and assembly procedure of the building.

Not only does the building get manufactured in parts, it is also is shipped in parts to enable it to be efficiently transported. Keeping this in mind, Interarch ensures their logistic planning goes hand in hand with the requirements at the site for execution. Interarch does not advise any material to be lying uncovered or on the ground for prolonged periods of time at the site and hence ensure that the execution process is always fully supplemented with a material delivery at the right speed

Interarch trucks are tracked daily, and only authorized transport agencies are permitted to carry material for Interarch. All Material is insured and responsibly of the material is of Interarch until it is handed over to the site teams. Interarch transporters are trained on material handling and driving precautions while carry Interarch material.

 
Delhi Cargo Service Center Spotlight
   
Interarch delivered a Greenfield air cargo terminal building at Delhi airport, the cargo building is spread over 70000 Sq. Mt. The facility has the capacity to handle close to 1 million MT of cargo and facilitate smooth cargo & logistic operation at Delhi Terminal.

Interarch completed the project in record time of 12 months which included engineering of the buildings, manufacturing, logistics and erection of the building.

This building is utilized for Air Cargo Warehousing and handling at International Airport which includes Storage, Unitization & build-up, Cargo break bulk & delivery, AWB check Perishable cargo handling, Inter-terminal Reefer service, X-ray Screening & Security Services, Complete airport related customs processing activities for export and import cargo ,Security screening and physical examination etc.

The Delhi Cargo Service Centre project at IGI New Delhi is the largest cargo center of its kind, and is a multi-level cargo facility. The building has 3 level floors using steel Mezzanine-with 12 m bay for optimum space utilization and these floors are built to handle fork lifts moments.

Project Name Delhi Cargo Service Center
Project  Location Delhi
Project  Usage Cargo Warehouse-ground + 2 multistory building
Tonnage of building 5850 MT
Roofing Supplied in MT 30,000 Sq. M
Important Feature  of Project :
22 meter height
3 level floor using steel Mezzanine-with 12 m bay
Architecture design & Structure
1:40 roof slope (virtually flat roof)
Each floor designed for 5 MT loading for forklift movement
Silicon modified polyester coated standing seam roofing
Architectural profile with slope wall for aesthetic with fascia
Design to handle specialized pallet/racking system provided by Siemens.
Designated bays of 12 M inside the building for truck moment

Interarch Building Systems used in the project
 
5850 MT of built up Pre - Engineered Steel Buildings.
Hi Rib Wall cladding System- Autumn Red & off White.
SS - 2000 Roofing System- Off White.
 
 
Project Management - Quality & Safety aspects during Erection
   
Quality check Points before Rafter erection
Check bolts sizes and part marks of rafter assembly
Check Bolt tightening as per following procedure
Diagonal bolt tightening
Initially snug tightening of bolts
Final tightening by torque wrench as per defined torque value
In case of Turn of nut tightening, HO-QC approval to be taken
Turn of nut tightening to be ensured with proper marking
Fixing of secondary item to be ensured
Check the alignment of rafter assembly at ground level
Painting quality to be checked after assembly of Rafter
Visual painting to be checked & touch up if required
Surface cleaning to be ensure in case of any dust, handling marks etc
Safety during rafter erection
During assembly of rafter pieces on ground provide proper support on both sides
During assembly of rafter pieces the workers should not position their hands in between the pieces of rafters
Connect the appropriate wire rope with proper packing’s to the rafter at the appropriate place
Workers should not position their hands in between the hoisted rafter and the column
Ensure the rafters are adequately and securely temporarily braced at appropriate place with steel wire rope ( minimum 16mm diameter )
Never take the boomlift under the hoisted load
Crane should only be released when all connection bolts are tightened and temporary bracings installed adequately
 
 
 
Industry Spokesperson - Mr. M Suresh, Director , P.K Associates
   
Interarch works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects. Building Innovators forum which is an initiative by Interarch brings together the industry renowned Architects and consultants for supporting modern pre-engineered steel construction to build a new India.

Mr. M. Suresh is the Director of PK Associates, has over 25 years of experience in Civil & Structural Consultation and has been executing Pre-Engineered Buildings since 2002.
Mr. Suresh stated that “Automobile & Auxiliary industries to boom in the coming years in the southern region provided the power cut problem is sorted out. Pre-Engineered Green Buildings is undoubtedly a solution and will have a huge demand in coming future.

Pre-Engineered Buildings with Solar Panels will be a basic requirement in future.

He advises that “First Grade PEB Vendors are always good, even if the price is comparatively high, Moral Responsibility; Assurance in Quality & Services is always present, which you cannot find the same in next level vendors”.

His experience with Interarch has been great and he stated that Interarch has always delivered the highest standards of quality for the price. Since, Interarch has got its plant in Chennai, it is one of their strengths in delivering projects the consumer is gets benefit of this, in terms of faster supply and erection of projects. In case of any change or addition to the requirement of the building proposed, they get it done easily thus providing 100% tailor made solutions for all you project needs.

 
Building Maintenance Tip for Buildings with Crane
   
Every 6 months check and ensure that all bracing is tight
Check and ensure that all high strength bolts in the crane beams and main frame connections are tight
 
Customer Testimonial
   
We appreciate the hard work & dedication exhibited Interarch’s team for ensuring safe completion of erection activity. It was commendable to see your team’s commitment to ensure adherence to Safe working practices. Please accept our sincere appreciation for the excellent job done.

 
Interarch Foundation
   
Interarch’s vision is to actively contribute to the social and economic development of the communities in which we operate. In doing so, we contributed our bit by building a better sustainable way of life for the weaker sections of society for raising the country’s human development index.
Primarily our focus areas
To provide quality education to children of under-privileged masses and our workers
To provide medical and health facilities to our workers and needy people public irrespective of the status, caste, creed, or religion to which they belongs
To help the poor, widows, the needy, the orphans, the old/infirm, the destitute and the incapacitated in the form of money, education of any kind, scholarships, medical aid or in any other form for their rehabilitation which the situation demands and the trustee deems fit
To promote all activities for physical, social, cultural and financial uplifting of the general public

 
Awards
   
Interarch won Safety Appreciation letter from Toyota Kirloskar Motor Pvt. Ltd., Bangalore.
 
 
Building Made Possible in Steel- Madrid-Barajas Airport
   
Steel Tonnage: 350000 Tons of Corrugated Steel & 30000 Tons of Laminated Steel Girders
Total Area: 1158000 Sq. m
It has a basement which drops to as much as 20 meters (66 feet) below ground
It has an elevation of 2,000 ft. above sea level
The airport has 4 runways. These 4 runways have the following lengths: 15R/33L - 13,845 feet; 18L/36R - 11,877 feet; 15L/33R - 11,877 feet; 18R/36L - 14,665 feet
The new terminal has an area of 470000 Sq. M & its L- 1142 M
One of the largest buildings constructed in Europe
Light filled canyons divide the parallel floors to accommodate passengers traffic
The columns consists of 14mm thick hallow pipes, which are 800X480 mm at the base and 480X200 mm at the head

 
 
New Project Wins
 
Ford India Pvt. Ltd, Gujarat
Shree Shubham Logistics, Maharashtra
AeroconBuildwell Pvt. Ltd, Madhya Pradesh
Yamaha Motors India Pvt. Ltd, Tamil Nadu
Hema Engineering Industries Ltd, Haryana
 
Press Coverage
 
NBM & CW
Construction World
CE&CR
B2B Purchase
Construction Week
 
Projects Completed
 
Astrotech Steels Pvt. Ltd, Andhra Pradesh
Carrefour WC & C India Pvt. Ltd, Uttar Pradesh
ABB Ltd, Gujarat
FJM Cylinders Pvt. Ltd, Haryana
Satyam Automobiles Pvt. Ltd (Mahindra showroom), Bihar
 
Trivia Question of the month
 
Q. How many Petrol pump canopies have been delivered by Interarch?
a) 500
b) 700
c) 900
d) 1100
Kindly log on to our Facebook page and provide the answer Note: The answer will be valid only if you first like the page
 
Upcoming Events
 
 
Interarch invites you to Building Innovators Forum in Rajkot, Gujarat on 26th Jul’13
 
 
     
Share my campaign Click here to submit your enquiry online
INTERARCH BUILDING PRODUCTS PVT. LTD.

Central Marketing Office, B-30, Sector 57, Noida - 201 301, India
Tel.: +91-120-4170200, 2581029 | Fax: +91-120-2581017 | E-mail: info@interarchbuildings.com |
visit us at: www.interarchbuildings.com, www.interarchinfra.com